এক নজরে চুয়াডাঙ্গা

Posted on November 25th, 2025 | post in |Comments Off on এক নজরে চুয়াডাঙ্গা

Chuadanga Pourashava At a glance

Municipality General Information:

Established: 20 January 1972
Class A
Area 37. 37​ Sqm
Total Population

(According to the 2022 census)

97532 Person
Woman 49522 Person
Male 48010 Person
Population Density (per Square in kilometers) 2636 Person
Ward Number 09
Mouza Number 13
Administrator 01 Person
Mayor (elected) N/A
Total Councilor (elected) N/A
Reserved Seat (Female) N/A
General Seat N/A
All The end Election Uneventful Date December, 2020
Organizational Structure Covered Officer / Employee Number 162 Person
Working Officer / Employee Number 90 Person
Working Officer 05 Person (20/10/2025)​​​ of Information According to)
Working Employee 85 Person (20/10/2025)​​​ of Information According to)
Project Staff 03 Person (RUTDP)
Master Roll 135 Person
Telephone Number (Administrator) 02477787881 (Office)
Email​​ mayor16cp@gmail.com
Web Site www. chuadangapourashava.org
Municipal Physical Infrastructure Description:  
Road/Highway Description:  
Pucca Road 126.00 Km
R. C. C. Road​​​ 31.00​ Km
H. B. B. Road​​​ 70.00​​ Km
Katcha Road 35.50 Km
Total 262.50 Km
Light Regarding Information:  
Total Poll Number 5020
H T Poll 5500
Non Street Phase 950
Street Phase Line Poll 4070
Street Phase Line (Km) 125.00 km
LED Bulb (15-20 Watt) 4020
LED Bulb (50-150 Watt) 50
Total Bulb Points 4070
Street Line Coverage Area 75%
Water Supply Regarding Information:  
Pipe Line 113.21​ Km
8” Dia 29.164 Km
6” Dia 26.937 Km
4” Dia 56.092 Km
Total House Connection 7910
Residencial 7737
Commercial 173
02 ‘ ‘ House Connection 1
1. 5 ‘ ‘ House​ Connection 21
01 ‘ ‘ House Connection 106
3/4 ” House​​ Connection 4248
1 / 2 ‘ ‘ House Connection                       3534
Disconnet line 1203
Total Pump House 16
Active Pump House 14
Immobile Pump House 02
Total Hand Tube 1153
Active Hand Tube 919
Lost Hand Tube 234
Over Head Tank 04
Street Hydrant 11
Municipal Vehicles Information:  
Pajero Jeep (11 – 0007)​​ 01
Doble Cabin Pickup 02
Hydraulic Beam Lifter 01
Ambulance 01
Desalination Vacuum Tanker 01
Motor Bicycle (Active) 03
Motor Bicycle (Damage) 01
Drum Truck 03
Truck Capacity Garbage (1.5) tons​​ 02
Eicher Drum Truck 03
Road Roller (3 Ton) 02
Road Roller (6 Ton) 01
Road Roller (8 Ton) (1 No Damage) 02
Garbage Van (Manual) 10
Garbage Van (Engine) 06
Municipal Motor Garage 02
Foot Drainage Arrangement :  
Total Drain Length 80 Km
Brick Drain 51.00​ Km
Drain ( R C C) 29.00 Km
Raw Drain 00
Box Calvert 60
Bridge 05
Sluice Gate 01
Nobogonga Canal 3.00 Km
River Mathavanga River
Clean Worker Number :  
Garbage Lifting Worker 80 Person
Sweeper 55 Person
Total Van Car 17
Active Van Car 17
Immobile Van Car 00
Mass Toilet  Information:  
Total Mass Toilet 08
Bus Tenminal 01
Sadar Hospital 01
Kadergonj Bazar 01
Nicher Bazar 01
Murgi Bazar 01
Boro Bazar 01
Rail Bazar 01
Gom Porty 01
Health Category:  
Sanitation Coverage Rate 91 %
Birth Registration Rate 100 %
Certificate Distribution Rate 65 %
Fogger Machine 04
Normal Spray Machine 10
Health Departmental Information Board 01
Adulteration Food Goods Regarding Case ( December, 24 until ) 02
EPI Regarding Information:  
Total EPI Center  36
Permanent EPI Center 04
Temporary EPI Center  32
Regular Vaccination Receiver 00 – 11 Month Old Baby Number 2309​​ Person ( December/2024) of Information According to )
Regular Vaccination Receiver 15 – 49 Year Woman Number 5670​​ Person ( December/2024) of Information According to )
Ward Health Committee 00
Trained Volunteer Number 11 Person
Trained Priest Number
Trained Midwife Mother Number
Trained Imam Number
Trained Rural Doctor Number
Fridge 01
I L R 02
Deep Fridge 03
Cold Box 02
Total License Number (2025-26) 3755
Renewal October/25 1935
Collection October/25 57,38,955
Municipal Tax Regarding Information:  
Holding Number (private ) 18565 nos.
Holding Number ( official ) 171 nos
Total Holding Number 18736 nos.
Annually  Hal Claim (official ) 29806387.00
Annually  Hal Claim ( private ) 32447060.00
Annually  Total Claim : 62253447.00
Tax To collect Rate 70.33 % (2024-25 FY)
Tax Of charge Quantity 22 %
Holding Tax 7 %
Conservancy Rate 7 %
Lighting Rate 3.7 %
Water Tax 5 %
Trade License Regarding Information:
Rickshaw Owner 00
Rickshaw Driving 00
Van Owner 00
Shop 3227
Cold Storage 00
Hospital / Clinic 30
Diagnostic Center 80
Insurance Company 09
Private Bank 23
Doctor ( MBBS) & Homeopathy​ 37 Person
Medicine Shop/Depot 230
Mill Factory 34
Contractor License 41
Fish – meat Businessman 86 Person
Municipal Shopkeeper Regarding Information:  
Municipal Shopkeeper Center Number 05
Municipal Shopkeeper Center Shop Number 90
Shop Rent ( 24 – 25) Meaning Year demand ) 5,89,800.00 Taka​​​
Shop Rent ( 24 – 25) Meaning Year (Acquisition ) 5,46,575.00 Taka​​​
Shop Rent To collect Rate 92.73 %​
Municipality Owned Market Name O Address : Shop Number
Kadergonj Poura Super Market 51
Poura Busterminal Market 30
1 No Water Tank Market 06
Shahitto Porishad Market 02
Poura Bhaban Gate 01
Municipality Owned To be built Market Name Shop Number
Poura Super Market At present
Municipality Owned Hat Market: Number
Total Hat Market 04
Boro Bazar Hat 01
Kadergonj Nutun Bazar 01
Rail Bazar 01
Poura Solir Hat 01

Lease Covered Pond, water body & Fallen Of land Information:

Total Pond/Water body
Sat Vai Pond 66 Decimal
Kana Pukur Para Pond 66 Decimal
Rail Para Pond 100 Decimal
Belgachi Bokchor Para 330 Decimal
Vimrulla Para 132 Decimal
Sadek Ali Mollick Para 66 Decimal
Mili Pond 100 Decimal
Municipality Managed Education Organization Description :  N/A
Municipality Owned Establishments  
Municipality Building 01
Mosque 01
Garage Building 01
Old Municipality Building 01
Municipal Area Slum Regarding Information :
Ward No.

Total Slum

01 No. Ward

01

02 No. Ward

00

03 No. Ward

00

04 No. Ward

00

05 No. Ward

03

06 No. Ward

01

07 No. Ward

00

08 No. Ward

01

09 No. Ward

00

Total Slum

06

Slum Area Total Family Number

507

Slum Area Total Population

2026 Person

Municipality Past Four Year Holding Tax Demand & Collection

Meaning Year

Demand

Collection

2024-2025

7,45,14,862.00

5,24,09,361.00

2023-2024

5,66,00,869.00

4,47,46,669.00

2022-2023

5,26,25,895.00

4,19,85,893.00

2021-2022

5,04,80,467.00

4,30,69,934.00

Municipality Past Four Year Budget Allocation

Fiscal year

Allocation Quantity

Real Expenses

2024-2025

86,99,86,046.85

18,49,64,201.15

2023-2024

103,12,92,892.82

20,91,42,482.91

2022-2023

108,47,73,996.00

39,97,30,598.65

2021-2022

71,76,37,000.00

17,14,83,839.00

In the Municipality Trending Projects Description: 
Local Government Covid-19 Response and Recovery Project (LGCRRP) 
Resilient Urban and Territorial Development Project (RUTDP) 
Transportation Regarding Information :  
Rail Station 01 
Bus Terminal 01 
Bus Stand 04
Rickshaw Stand 10 
Rent A Car Stand 01 Academy More 
Truck Terminal 01 (Proposed) 
Historical/Important Establishment Address 
V.J Govt. High School Established 1880 Thana Road  
Chuadanga Rail Station Established 1859 Rail Shation 
Post Office Established 1772 A
Municipal In the area Located Education Organization  Number
Open University

01

Private University

01

College Govt.

02

College Non Govt.

01

High School Govt.

02

High School Non Govt.

07

Homeopathic College

01

Technical Training Center

02

Primary School Govt.

25

Kindergarten School

14

Madrasa

08

Municipal In the area Located Treatment Establishment Description

Number

Sadar Hospital Govt.

01

Chest disease Hospital

01

Eye Hospital Non Govt.

01

Diabetic Hospital

01

Hospital Non Govt. (Clinic)

10

Kidney Hospital

01

Mother and Child Welfare Center

01 

Drug addiction Treatment Center

01 

Blood Donation Center

01 

Animal Hospital

02 

Income and expenditure report for the last three years (Water)

Fiscal year

Income

Real Expenses

Surplus

2022-2023

2,62,25,369.00

2,51,79,624.00

10,45,745.00

2023-2024

2,81,88,348.00

2,68,98,098.00

12,90,250.00

2024-2025

2,89,33,317.00

2,74,85,723.00

14,47,594.00

Income and expenditure report for the last three years (Revenue)

Fiscal year

Income

Real Expenses

Surplus

2022-2023

9.95,67,050.00

9,64,19,269.00

27,55,981.00

2023-2024

9,34,46,474.00

9,06,90,493.00

8,38,34,642.00

2024-2025

9,95,75,061.00

9,95,75,061.00

1,57,40,419.00

Income and expenditure report for the last three years (Plan approval)

Fiscal year

Income

Plan approval Nos

Remarks

2023-2024

60,24,645.00

249

2024-2025

44,03,516.00

182

2025-2026

20,68,311.00

52

October/25